Retrofit Scheme of a 75 T/h Circulating Fluidized Bed Boiler with Two-stage Window Blind Seperator

ZHANG Jiansheng,LU Junfu,LIU Qing,Yue Guangxi,CAO Jinli,YU Yongbo
DOI: https://doi.org/10.3969/j.issn.1674-1005.2005.02.003
2005-01-01
Abstract:The low load and attrition problem of the existing 75 t/h circulating fluidized bed (CFB) boiler with two-stage window blind separator is given herein. According to the customer's requirement and the site condition, combined with the feature of the boiler , retrofit scheme using water-cooled square separator which is compact designed is proposed.