Lightning Shielding Failure Characteristics of UHVDC Transmission Line Using Leader Progress Method

王志勇,余占清,李雨,何金良,耿屹楠,梁曦东
DOI: https://doi.org/10.13336/j.1003-6520.hve.2011.09.006
2011-01-01
Abstract:Shielding failure of lightning is the key problem for safe operation of high voltage transmission lines,and lightning protection for ultra high voltage DC transmission lines are more significant.The method for analyzing the shielding failure rate of ultra high voltage transmission lines based on the leader progress method was introduced,by which the shielding failure characteristics were calculated.Effects of insulating levels,shielding angles and terrains on shielding failure rate were analyzed.Moreover,lightning path and current distribution of shielding failure under typical terrains were studied,and influence of polarity on shielding failure rate was analyzed.Results show that the shielding failure rate decreases with the decreasing of shielding angle.The conductor at outside of mountain slope is easier to be stricken because the shielding effect of ground lines is worse,and the lightning may strike the conductors horizontally.The shielding failure rate rises with increasing of valley depth.It is shown by both calculation and operation experiences that the shielding failure rate of the positive pole is much higher than the negative pole,and shielding failure trips almost happen on the positive pole on top of mountain ridges.
What problem does this paper attempt to address?