MEASUREMENTS AND RESEARCH OF SWITCHING OPERATION TRANSIENT ELECTRIC FIELD IN 500kv SUBSTATIONS

卢斌先,王泽忠,李成榕,丁立健,王伟,王景春
DOI: https://doi.org/10.3321/j.issn:0258-8013.2004.04.025
2004-01-01
Abstract:Switching operations in substations, including circuit breaker operations and disconnect switch operations, can generate transient switching electric fields. We measured switching transient electric fields in the field of two 500kV substations. This is the first switching transient electric field measurement in the field of 500kV substations in china. A three-dimensional electric field sensor which is spherical and active was used in the measurement, and can measure maximal value of 48kV/m. The electric fields generated by several kinds operations, including energizing and de-energizing open bus sections and the short line by operating disconnects, energizing open long transmission lines and energizing open transformer by operating circuit breakers, were measured. After analyzing the measured data, some important characteristics of switching fields were obtained. These characteristics are useful for theore- tical analysis and practical engineering interference analysis in power substation and susceptibility experiments of protection and control equipments.
What problem does this paper attempt to address?