Study on Four HVDC Systems Sharing a Common Ground Electrode

饶宏,李岩,黎小林,张晓,尹晗,何金良
2012-01-01
Abstract:Focusing on the two circuits of Xiluodu-Guangzhou ±500 kV DC transmission engineering,we analyzed the possibility that the double circuits Xiluodu-Guangdong projects share the Yulongling common ground electrode,which was built for Yunnan-Guangdong ultra high voltage DC transmission project and Guizhou-Guangdong Ⅱ DC transmission project,to avoid building a new ground electrode so as to save land and construction cost.Moreover,we analyzed all possibilities of multiple projects operating in ground return mode synchronously,and respectively discussed their probabilities and short-time maximum currents through the earth.Analysis shows the constructed Yulongling ground electrode can satisfy all possible conditions of two projects operation in ground return mode when four projects share the Yulongling ground electrode.Considering the actual operation conditions and system control demands of DC transmission systems,the probability when three projects operate in ground return mode synchronously approaches zero,and the probability when four projects operate in ground return mode synchronously is zero.After combining with the technical and economic aspects,the existing Yulongling ground electrode can satisfy the demands of being shared by four projects.In accordance with the theoretically existed probability which three projects operate in ground return mode synchronously,the scheme that the Yulongling ground electrode was expanded as three-ring structure was proposed,satisfying the step voltage demands when large ground-return current passes through it.
What problem does this paper attempt to address?