Technology Research of Reinforcement at the Getting Into Shaft on the Shield Tunnel Construction Method on Soft Clay Region

Kou Baoqing,Du Wei,Bai Dong,Chang Xiping,Liu Guangren
DOI: https://doi.org/10.3969/j.issn.1001-8972.2009.24.024
2009-01-01
Abstract:It adopts slurry balanced shield machine in the Yangtze River tunnel of the second west to east gas pipeline project.It is complex of geological conditions at the getting into shaft,with silty clay、fine silty sand and gravel,it brings threat to get into shaft with shield tunnel machine.Consider shaft structure and requests of construction,adopt deep mixing technique to reinforce clay at the shield tunnel machine getting into shaft.This article has carried on the technology research to the reinforcement.