Research on Caisson Dewatering Technology of River-crossing Tunnel

Bao-qing KOU,Xi-ping CHANG,Guang-ren LIU,Dong BAI,Wei DU
DOI: https://doi.org/10.3969/j.issn.1007-9467.2010.01.033
2010-01-01
Abstract:It adopts open caisson technique construction in the Yangtze River tunnel of the second west to east gas reception well project.It is soft layer,abundant groundwater and strongly pervious in the construction area,so the caisson sinking construction adopt the drained sinking method.At present,the effective and economical method for controlling the groundwater table is the method to lowering ground water level in well-point to ensure the quality of the caisson sinking construction.Dewatering has the prominent effect for avoiding quicksand and piping,keeping the dry coating environment、improving the intensity and stability of the earth.This article has used the unsteady-state principle of the underground water hydrau-lics and the postulate of the soil mechanics to analyse the excavation and precipitation and the ground settlemen.carried on the technology research to the reinforcement and has indexed the measure to reduce the ground settlement of the precipitation.
What problem does this paper attempt to address?