Research on Grouting Reinforcement Construction Technology of Reservoirs in Water Conservancy Project Construction

Li Yu,Gaoyang Sui
DOI: https://doi.org/10.23977/jceup.2023.050704
Abstract:: In order to improve the service life of reservoirs and reduce the risks associated with their use in water conservancy projects, this study focuses on the curtain grouting reinforcement construction technology applied in the construction of reservoirs in a specific region. The physical and mechanical properties of the geological conditions of the dam foundation site of the reservoir are analyzed, taking into account factors such as construction period, cost, and desired treatment effects. The curtain grouting reinforcement technology is adopted, which involves five steps: drilling, flushing, hydraulic testing, grouting and sealing, and special case handling, to reinforce the leakage of the reservoir. The reliability of the reinforced anti-seepage measures is analyzed using finite element models. The experimental results show that the construction results of each step meet the construction standards. The permeability coefficients at different locations are within the allowable range of 8.9×10-6cm/s, and the results of the specific discharge of the soil layers are smaller than the allowable decrease in specific discharge. The construction effect meets the reinforcement requirements.
Engineering,Environmental Science
What problem does this paper attempt to address?
The paper attempts to address the issue of seepage control and reinforcement in reservoir projects within hydraulic engineering. Specifically, the study aims to enhance the service life of reservoirs and reduce risks during their usage by adopting curtain grouting reinforcement technology. By analyzing the physical and mechanical properties of the geological conditions at the reservoir dam foundation in a specific area, and considering factors such as construction period, cost, and expected treatment effects, the study employed a curtain grouting reinforcement technique that includes five steps: drilling, flushing, water pressure testing, grouting, and hole sealing to improve the seepage control performance of the reservoir. Additionally, the reliability of the seepage control measures after reinforcement was analyzed using a finite element model, and experimental results verified that each construction step met the construction standards. The permeability coefficient was within the allowable range (8.9×10^-6 cm/s), and the specific discharge of the soil layer was also less than the permissible reduction value, meeting the reinforcement requirements.