Researches on Techniques for Shield Machines Entering Holes in Jiangxi Jiujiang Section of West-East Gas Pipeline Ⅱ

Wang Le,Zhang Huanjie,Du Wei
DOI: https://doi.org/10.3969/j.issn.1006-5539.2011.06.022
2011-01-01
Abstract:Because there is poor bearing capacity in such soft soil layer as sand layer and sludge layer,it is necessary to take some measures to ensure that shield machines enters holes successfully in order to prevent water and sands from gushing when these machines enters holes in such soft soil layer.In Jiangxi Jiujiang Section of West-East Gas Pipeline II project,dewatering method was adopted to drain out groundwater and stabilize the soil body of the excavation face so as to prevent quicksand from occurring during construction.Pre-buried steel plates were welded together with each other to strengthen stabilization between these steel plates and strengthen stability of whole tunnels so as to prevent deformation of steel plates and circumferential weld leakage.Furthermore,adopted were a kind of composite sealing devices which consist of flaps rubber sheets and a ring of fan-shaped linking pieces and emergency seal air bags.In the aspect of shield construction progress control,corresponding tunneling modes were adopted in different tunneling stages.The above technical measures were so necessary for ensuring that shield machines enters holes successfully.
What problem does this paper attempt to address?