Analysis of influence of ground penetrating shield tunnel excavation on adjacent underground pipeline

Gang WEI,Wen HUANG,Xin JIANG
DOI: https://doi.org/10.19713/j.cnki.43-1423/u.2017.09.018
2017-01-01
Abstract:In this study, the calculation of formulas of soils settlement caused by soils loss in the construction of ground penetrating shield tunneling was established. Based on Winkler foundation model, the force model of underground pipeline was simplified, and the calculation of formulas for stress, strain and bending moment of a vertical- crossed underground pipeline caused by the construction of ground penetrating shield tunneling were deduced. The study considered the elevational angle as β in the ground shield driving, then discussed the influence of changes on the soil condition, and buried the depth and the diameter of pipeline on the bending moment of underground pipeline through analysis with examples. The result showed that the bending moment of the pipeline at the rear of the shield tunneling excavation face was gradually decreasing with the increase of angle β. However, the change of that in front of the excavation face was very small. Angle β, the buried depth and the change of diameter of pipeline only affected the surrounding environments with the maximum positive and negative bending moments of the lateral pipeline, but had little effect on other parts. The maximum positive and negative bending moments of the pipeline in hard clays were larger than that of the pipeline in soft clays, but the influence range of pipelines in soft clays got larger and larger.
What problem does this paper attempt to address?