Vertical Displacement of Underground Pipeline Caused by Shield Tunnel Crossing in Pasternak Foundation

Gang WEI,Bin WANG,Xun XU
DOI: https://doi.org/10.3969/j.issn.1671-1815.2017.33.023
2017-01-01
Abstract:By using the three dimensional solution of uniform ground movement pattern to calculate the soil vertical displacement in the plane of underground pipeline caused by shield construction,simplifying the mechanical model of underground pipeline based on Pasternak foundation model,the three-dimensional calculation formula of vertical displacement of underground pipeline caused by single and double shield tunnel excavation is established.By comparing the calculated results with the measured values,the influence to the vertical displacement of pipeline is discussed of changing in pipeline material,buried depth of pipeline and soil loss rate.The result indicates that the calculated value almost coincides with measured value,which can be used to calculate the working conditions of single and double shield tunneling;The vertical displacement of the pipeline caused by double tunnel excavation is larger than the vertical displacement caused by the single line tunnel;The change of pipeline material and the buried depth of pipeline have little effect on the maximum vertical displacement of pipeline,The maximum vertical displacement of pipeline decreases with the increase of pipe bending stiffness,and increases with the increase of buried depth of pipeline;The change of soil loss rate has a great influence on the maximum vertical displacement of pipeline,and the maximum vertical displacement increases with the increase of soil loss rate.
What problem does this paper attempt to address?