Research on Surface Heave and Subsidence Caused by Multi-factor in Double-line Shield Tunnels Construction

Gang WEI,Xinhai ZHANG,Xinxin HUA
DOI: https://doi.org/10.13409/j.cnki.jdpme.2017.06.010
2017-01-01
Abstract:Three-dimensional calculation approaches of surface heave and subsidence caused by double-line parallel shield tunnel (DLPST) construction is studied in the article.Considering the combined action of the bulkhead additive thrust、the friction force、the grouting pressure and the ground loss,basing on the superposition principle and mutual influence between the first and the second tunnel,the total three-dimensional surface subsidence caused by DLPST construction is obtained.This method can be applied to the stage of construction.Considering the influence of the distance J of the tunnel and the change of K,which is the distance of the excavation face of the first and the second tunnel,the analysis results of the examples show that the proposed method is consistent with the measured values.If K is decreasing,the shape of the surface vertical subsidence curve will be from ladder shape to S shape and the maximum surface settlement and the amount of bulge both will increase.If J is increasing,the shape of the surface lateral subsidence curve will be from V shape to W shape and the maximum surface settlement will decrease.
What problem does this paper attempt to address?