The Construction Technology of Great High Open Caisson Wall

Cao Huiqing,Du Wei,Wang Le,Kou Baoqing,Xie Huhui
DOI: https://doi.org/10.3969/j.issn.1001-8972.2010.23.027
2010-01-01
Abstract:In this paper,The shaft for the Songhua River shield tunnel on the changling-changchun-jilin gas pipeline project is given an example.Introduces a kind of construction technology for great high open caisson,with one-time-concreting height to 9 meters,and good appearance,which can be taken for example on similar projects.
What problem does this paper attempt to address?