Key Techniques for Hydraulic Pushing Slip of Cable-stayed Bridge with Steel Truss Girder

Huang Sheng,Wang Chaoyang,Hu Xiaoyong,Zhang Zhiwei,Jiang Guanye,Tan Shenzhou,Wang Beibei
2012-01-01
Abstract:In steel truss cable-stayed bridge construction,due to the need for the main tower symmetry and cable to eliminate lasso the main tower of the lateral force,the construction method includes the installation of steel truss above bracket in the main tower,and then symmetry installation of steel truss for the independent tower.Based on installation of steel truss for Powder Room Bay Yangtze River Bridge engineering,the authors introduce construction technology of accumulative sliding with hydraulic pushing for steel truss above bracket about cable-stayed bridge with steel truss.According to the reaction and friction on pier top,four sets of hydraulic pushing equipments with 1 000kN level are equipped.The maximum weight for accumulating sliding is 1 100t,the distance for accumulating sliding is 52m,multipoint-continuous-dynamic control technology is used for pushing operation.
What problem does this paper attempt to address?