On-Site Production of Quasi-Continuous Ultra-High Vacuum Pipes

Matthias Angerhausen,Guido Buchholz,Jef Hoste,Marion Purrio,Achim Stahl,Lars Stein,Patrick Toussaint
2023-05-11
Abstract:We present a design study for a new production technology for ultra-high vacuum pipes. The pipes are produced in a fully automatised process in sections of hundreds of meters directly in the later location of usage. We estimate the effort for such a production and show that it might be substantially lower than the effort for an off-site production of transportable sections.
Instrumentation and Methods for Astrophysics,Instrumentation and Detectors
What problem does this paper attempt to address?
The paper aims to address the production issues of ultra-high vacuum pipelines in the Einstein Telescope. Specifically, it proposes a new production technology that allows for the automated production of ultra-high vacuum pipelines up to several hundred meters long directly within the tunnel, rather than prefabricating shorter pipeline segments in a factory and then transporting them to the site for welding as in traditional methods. ### Main Issues: 1. **High Cost**: Traditional methods require a large number of prefabricated pipeline segments and thousands of welds within the tunnel, leading to high labor costs. 2. **Reliability Issues**: Multiple welds increase the risk of leaks, resulting in higher subsequent maintenance costs. 3. **Space Constraints**: There are space limitations when transporting longer pipeline segments, especially during the process of placing the pipelines into the tunnel. ### Solution: The paper proposes a novel solution, which involves using automated robots to directly produce long pipeline segments on-site, including the following key points: - **Automated Production**: Automated robots produce pipeline segments up to 500 meters long directly within the tunnel. - **Laser Welding**: Laser welding technology is used to complete the longitudinal welding of the pipeline in a vacuum, improving welding quality. - **Continuous Production**: Continuous production reduces the number of welds, thereby lowering the risk of leaks. ### Expected Outcomes: - **Cost Reduction**: Reducing the number of on-site welds significantly lowers labor costs. - **Increased Reliability**: By reducing the number of welds, the likelihood of pipeline leaks is decreased. - **Improved Efficiency**: It is expected that the entire pipeline production work can be completed within 2 to 3 years. In summary, the paper presents an innovative solution aimed at optimizing the production process of ultra-high vacuum pipelines through the application of automation and new technologies, thereby providing a more efficient and reliable solution for the construction of the Einstein Telescope.