Research on synchronous grouting mixing proportion of saturated sand stratum shield tunnel

Yuan Zhe
Abstract:The construction of shield tunnel used synchronous grouting measures to reduce the adverse effects of architectural clearance.Through the experiments ways,taking cement aggregate as the starting point,compared the change characteristics of slurry fluidity,strength,bleeding and shrinkage,system researched the synchronized grouting materials mixing proportion,and combining with the monitoring data in engineering implementation process to validate,derived synchronous slurry materials mixing proportion suited to saturated sand stratum,provided guidance for future similar projects.