Case study of slurry shield driving parameters' influences on ground surface settlements

Lin Cungang,Zhang Zhongmiao,Wu Shiming,Fang Kai
2012-01-01
Abstract:Through analysis of shield driving parameters and ground settlements in the construction of the Qing-chun Road river-crossing tunnel,the influence of shield driving parameters on ground settlements induced by tunneling were studied.The studies show that: ①Increasing the pressure of slurry and synchronized grouting appropriately can counterbalance some ground loss,so as to reduce the ground settlements.②The key to reducing shield tail ground loss is to fill the tail void immediately and effectively with synchronized grouting,but it should not be simply increasing the grouting volume.③With stabilization of the shield driving,higher advance rate leads to smaller ground settlements,whereas long time stop would lead to larger ground settlements.④Decreasing the torque of the cutter head while increasing the rotational speed can accelerate the shield driving and decrease the disturbance to surrounding soils and revolution of the shield.It can also decrease the size of the muck from working face,so as to avoid the blocking of the slurry pipelines.⑤Good control of the shield posture can decrease over-cut,friction and squeezing between the shield shell and the surrounding soils,so as to decrease the ground loss and consolidation.⑥The irregular ground heave movements caused the shape of transverse ground settlements deviate from Gaussian curve pattern.
What problem does this paper attempt to address?