Closure Construction Monitoring Technology of the Super Long-span Steel Tied-arch Truss Bridge

Gou Jie,C. Second
Abstract:In construction of Chaotianmen Yangtze River Bridge,the main arch was first erected and closured,then the Rigid Tied girders. By Finite element analysis,a sensitivity analysis of the closure conditions was accomplished,the best closure adjustment programs was developed,various physical parameters including stress,linear,cable force,and the detailed principle of non-stress-closure were analyzed. All main arches and rigid tied girders achieved non-stress-closure,it can give useful references to the construction and controlling of similar bridges.
Engineering
What problem does this paper attempt to address?