Internal stud node of steel pipe concrete truss structure and construction method thereof

陈宝春,吴庆雄,韦建刚
2011-07-27
Abstract:The present invention relates to the truss structure and concrete construction method peg node for a steel pipe, including concrete and steel supervisor in charge of the outer wall of the connecting branch, characterized in that: said concrete filled steel tube welded to the supervisor region of the inner wall of the branch pipe connected to the there pegs, since the reinforcement pegs nodes within the combined action between the concrete and steel, the pegs therein under tensile or pressure manifold may hinder charge of radially outwardly convex or tangential slip, and so that a larger charge of participation force, improve the stress state of charge of the joints, to improve the bearing capacity of the node.
Engineering,Materials Science
What problem does this paper attempt to address?