Xi'an Nanwutai Tunnel's Design and Construction by NATM

Zhenping Huang
2005-01-01
Abstract:This paper based on a engineering example about Nanwutai tunnel(The fifth bidding section)'s construction,including excavation,preliminary support,measurement in-situ and secondary lining,the application of NATM theory in the tunnel's design and construction is introduced.
What problem does this paper attempt to address?