Dynamic Construction Mechanics Analysis of Xiamen Sub-sea Tunnel in Terrestrial Shallow Section

Wang Chun-miao
2009-01-01
Abstract:Based on the construction mechanics theory of underground engineering,the numerical model was formulated for simulating the CRD dynamic construction process of Xiamen sub-sea tunnel in terrestrial shallow section.The developing process of displacement was analyzed with excavation of various parts of the tunnel.The ground surface settlement of large-span shallow tunnel was analyzed by the Peck prediction method and numerical simulation method,and the numerical simulation results gave the dynamic process of ground surface settlement with the construction.The evaluation of lining security could be made by the mechanics analysis of primary support.With excavation,the dynamic process of stressed state and plastic zone were analyzed,providing theoretical foundation for evaluation of surrounding rocks stability.Through the analysis on dynamic construction of sub-sea large-span shallow tunnel,the mechanical response of surrounding rocks and supporting system were understood during construction process,and the present theory provided an scientific method for the dynamic design and construction of tunnel.
What problem does this paper attempt to address?