EXPERIMENTAL INVESTIGATIONS AND NUMERICAL PREDICTIONS OF HUMIDITY STATE OF A NEW BUILDING ENVELOPE

Danyu Tao,Yanling Guan,Yanli Gao,Anmin Tian,Guangyin Zhao,Lei Zhang
DOI: https://doi.org/10.19912/j.0254-0096.2019.04.013
2019-01-01
Abstract:At the Wei Shui campus of Chang'an University, an independent building was constructed according to the modern design and construction standards, a temperature and humidity testing system was installed on the outer envelopefor the continuous 897-day testing. Based on the data provided by the system, a dynamic simulation model of the thermal and moisture coupling of the enclosure structure was established with the help of CHAMPS software, and the experimental verification was carried out. Variations of moisture content in the outer enclosure structure of the new building were investigated both experimentally and with the help of numerical simulations. The change of the volume moisture content of the reinforced concrete (RC) north wall in 8 years after completion of the building was predicted by the simulations. The results show that more than two years (nearly 807 days) were required after the completion of the building were required for the RC north wall to reach the dry state according to the predictions, Moreover, it is demonstrated that the changes in volume moisture content with seasonal fluctuations show an annual periodicity with seasonal fluctuations.
What problem does this paper attempt to address?