Effect of DFCL Scheme on Navigation Conditions

Jianjun Zhou
2002-01-01
Abstract:The improvement of navigation conditions is one of the objectives for the Three Gorges multipurpose project. Upon completion of the project the Three Gorges navigation conditions downstream of the Jiulongpo will be improved significantly. The guaranted navigable ratio, therefore, will be up to 45 - 50% for boat fleet of 10 000 t from Wuhan to Chongqing, annual one-way goods transport capacity from the upstream to the downstream will be up to 50 M t, and the navigation cost from Yichang to Chongqing will be decreased by 35-37%. Through adjustment, the river discharge below Yichang in dry season will be increased and the navigable conditions below the Gezhouba will be also improved. In this paper the writers have proposed a double-flood-control-level (DFCL) scheme of operation to reduce sediment deposition in the Three Gorges reservoir, improve the navigation conditions and increase the flood control capacity.
What problem does this paper attempt to address?