The modified water complementation scheme from Daning river to Hanjing river,a kind of pumped storage system

Ma Jiming
DOI: https://doi.org/10.3969/j.issn.1003-1243.2004.03.004
2004-01-01
Abstract:The necessity of diverting water from Daning river to Danjiang river is discassed in this paper.It is considered that the power for pumping water can be supplied by the capacity of the hydropower stations with poor adjustment ability in the system.The period of pumping water is from May to November,when the inflow is abundant.Hence the output of units of the Three Gorges power station will not be affected.In the other months,however,the inflow of the Yangtze river is less.No more water is pumped from the Three Gorges reservoir during this period.Therefore the navigation and power generation will not be affected at all.And after the flood period,there is also enough time to fill up the Three Gorges reservoir.After the power stations on the Du river is constructed,the relative reservoirs will provide the adjustable storage capacity.Furthermore all stations on the Du river will supply the peak power as well as control of flood.The peak energy generated can be absorbed in the area of Central-China.So there is no need to transmit the electricity distantly to the East-China and Guangdong province.Estimating by different ways,the cost of compensating water is $0.1~0.3 Yuan/m +3.The original scheme which was discussed last year in this journal is now modified.It is considered that the water complementation would be put into practice by construction stages according to the water division requirement.The water complementation project discussed here and the present water division project of the middle route would not be constructed at same time.As a result,there is no influence on the active scheme,But the water complementation scheme related to South-to-North division project should be studied now in details.
What problem does this paper attempt to address?