Study on water-diversion of Dujiangyan Project

王兴奎,彭述明,徐兴文,孙砚方,郑钧
DOI: https://doi.org/10.3969/j.issn.1003-1243.2006.03.003
2006-01-01
Abstract:According to the measured data of 67 years in Dujiangyan, the rule of water-diversion of Fish-mouth and Precious-bottle-neck is studied in this paper. For more than 10 years before 1949, the water-diversion into Neijiang River was less than 50 percent in spring-time, while it was almost 60 percent in flood season, so that the rule of diversion ratio 40% to 60% is not exact. After the Waijiang Gate was constructed in 1974, the water-diversion into Neijiang River is close to 75 % in spring-time while it is only 37.5% in flood season, the water-diversion of Fish-mouth is now superior to the diversion ratio 40% to 60% in the past. The amount of water input into Precious-bottle-neck is influenced by the Sand-flying weir, maintenance of Renzi dike and digging in Fengqiwo. The industrial gate, built in 1992, ensures the water income of Precious-bottle-neck even without any digging for 10 years. The Waijiang gate and the industrial gate greatly improve the conditions of water-diversion of Dujiangyan, ensure the irrigation in spring-time and the security in flood season.
What problem does this paper attempt to address?