Study on the Security and Early-Warning of Flood Control of Dujiangyan Project

王兴奎,张尚弘,曲兆松,郑钧
DOI: https://doi.org/10.3969/j.issn.1003-1243.2005.04.007
2005-01-01
Abstract:The flood control system of Dujiangyan Project has not been well established,hereby the flood of Baishahe River can not be controlled.Even after Zipingpu Reservoir is built,it is possible that the flood with 10-year occurrence may damage the main project.A plan to construct Yangliuhu side-reservoir by making use of the old earth-dam of Yuzui Plant may effectively protect the hydraulic project and the cultural sight of Dujiangyan.For the security of projects,water environment and water resource,a preliminary assumption is presented for the flood early-warning system.
What problem does this paper attempt to address?