Analysis on pumping cost of multi-water sources joint-operation under various operating modes in Beijing

ZHANG Yannan,NI Guangheng,ZHANG Tong,TIAN Fuqiang,HU Xiaobing
DOI: https://doi.org/10.3969/j.issn.1000-0860.2014.09.011
2014-01-01
Abstract:Based on the application of the model of multi-water sources joint-operation in Beijing, the impact from the incoming-water from the South-to North Water Transfer Project diverted into Miyun Reservoir Storage Project on the water supply system is studied herein by taking both the amount of abandoned water and the water pumping cost as the starting points, and then the change of the system dispatching result after the flood control operation of Daning Reservoir is considered as well. The study shows that under the condition of the multi-year incoming-water from the South-to-North Water Transfer Project, if Miyun Reservoir Storage Project is not to be started to receive the incoming-water, a large amount of abandoned water is to be caused in the water supply system; while if the storage project is started, the capacity for storing and regulating the incoming-water is to be quite sufficient without occurrence of any events of water shortage or abandoned water within the system, however, the water pumping cost as much as 50~70 million yuan is to be annually caused. Under the consideration of the flood control operation, a large amount of abandoned water is to be annually caused, and then both the inverted regulation cost and the water-supplement cost are to be accordingly increased as well, thus it is suggested that the operation mode of Daning Reservoir must be determined under the comprehensive consideration of flood control and water supply benefits.
What problem does this paper attempt to address?