Research on Hydraulic Control Model of Beijing - Shijiazhuang Section of South to North Water Transfer for Urgent Water Supply for Capital Beijing

鲁帆,蒋云钟,王浩,董延军
DOI: https://doi.org/10.3969/j.issn.1001-4179.2007.01.012
2007-01-01
Abstract:In order to ensure water supply safety for capital Beijing and smooth conduction of the Olympic Games in 2008,water in Gangnan,Huangbizhuang,Wangkuai and Xidayang reservoirs originally servicing agriculture and environment is planned to be transferred to Beijing in 2007 through Beijing-Shijiazhuang canal section of Middle Route Project of South to North Water Transfer constructed in advance.So,the researches on correspondent hydraulic control model and computation method are urgent and possess important real significance.In consideration of the features of Beijing-Shijiazhuang canal section and canal safe operation,the special study of hydraulic computation model for open water transfer channel of Beijing-Shijiazhuang section for urgent water supply is carried out.The model computation can guide the operation of urgent water supply and policy decision.
What problem does this paper attempt to address?