Navigation Condition of the Upstream of Three Gorges Project Dam During the Initial 32 Years

WANG Xingkui,FANG Hongwei,WANG Guixian,CHEN Zhicong
DOI: https://doi.org/10.3321/j.issn:1000-0054.1998.01.013
1998-01-01
Abstract:The navigation condition of the upstream of Three Gorges Project Dam was experimentally studied for the initial period in this paper. In the period of the project operated for 32 years, the flow condition could satisfy the navigation demands only need to build 660 m short separating dike. The sediment deposition has no influence on the intake water of the ship lock within 20 years. After the project operated for 20 years, some draining sediment measures ought to be taken to guarantee the intake water. Some basic factors were analyzed such as the sediment amount coming into the dam area, the process of sediment deposition, the transport capacity of suspend load and the concentration distribution. The separating dike including the shiplift channel could be built after 32 years of the project operation.
What problem does this paper attempt to address?