Restore Water Levels in the River Channel Downstream of the Three Gorges Reservoir

G. Zhou,H. Wang,D. D. Jia,X. J. Shao
DOI: https://doi.org/10.1201/9781439833865.ch242
2006-01-01
Abstract:Among the many physical processes triggered by the impoundment of the Three Gorges Reservoir, the degradation of river channel downstream of the project will develop very quickly in the next few decades. This paper presents results of a numerical study on the effectiveness of proposed measures to reduce bed scour and to maintain water stage during dry seasons, by placing a layer of articulated concrete mattresses on the river bed at several selected locations in a reach 63 km long of the Yangtze River.
What problem does this paper attempt to address?