FLUVIAL PROCESSES IN THE LOWER JINGJIANG RIVER:IMPACT OF THE THREE GORGES RESERVOIR IMPOUNDMENT

xuejunshao,hongwang,zhaoyinwang
2005-01-01
Abstract:Sediment supply to the lower Jingjiang River will be subject to substantial reduction after the impoundment of the Three Gorges Reservoir,which could result in an excess of carrying capacity and serious bank erosions in the downstream alluvial channel,threatening the bank protection works and the safety of the Jingjiang Dyke. This paper presents a summary of research works concerning the fluvial processes in the lower Jingjiang River and the possible impact of the Three Gorges Reservoir impoundment on the variation of its channel pattern. Three different predictions have been put forward by researchers:1) the Jingjiang River will evolve towards a more sinuous,meandering channel pattern,with extensive bank erosion taking place along the river; 2) the river channel will be straightened and broadened because no point bar can be formed due to reduced sediment supply while bank erosion develops in the concave bank,and 3) this river reach will maintain its present channel pattern without significant change,although the sinuosity may be slightly reduced,since:a) the Three Gorges Reservoir mainly intercept sediment particles with sizes larger than 0.025mm,and b) the complex interaction between the Yangtze River and the Dongting Lake helps to reduce the negative effect of channel erosion through certain self-adjusting mechanism in fluvial processes. Discrepancy between these predictions shows that further research efforts are needed to understand the impact of Three Gorges Reservoir operation on the downstream fluvial processes. Meanwhile,there is an urgent need to closely monitor future development in the fluvial processes of the Jingjiang River and its influence on the safety of the Jingjiang Dykes.
What problem does this paper attempt to address?