Study on the Problems of Engineering Geology in Three Gorges Water Project

孙继云,张小平,施斌,包承纲
DOI: https://doi.org/10.3969/j.issn.1000-3665.2002.02.007
2002-01-01
Abstract:Second-phase cofferdam is key for Three Gorges project,First,on the base of surveying general engineering geology conditions,aim to the characteristics of second-phase cofferdam,main engineering geology problems such as the low water riverbed bed-rock deep-trench,the vibration liquefaction and seepage stability of fine sand layer in cofferdam foundation and the seepage stability of rock and soil in cofferdam foundation,have been surveyed and studied.Then,the design and construction for building second-phase cofferdam.are presented.