Numerical Simulation on Differential Settlement of Jointing of New and Old Roadbed

Chao-sheng TANG,Yi-huai LIU,Bin SHI,Yi CAI,You-qun ZHU
DOI: https://doi.org/10.3321/j.issn:1001-7372.2007.02.003
2007-01-01
Abstract:For the purpose of investigating the differential settlement problem occurred in jointing the new and old roadbed of freeway, the freeway from Nanjing to Shanghai, which was being extended, was chosen as an example and was simulated and analyzed by applying FLAC 3D. The characteristics of the stress and deformation, the developing process of differential settlement were studied after the load was added to the jointed embankments; deformation and development of roadbed, concentration and distribution of stress were discussed. It is indicated from the results that both the horizontal and vertical stresses concentrate in the jointed area which is the most unsubstantial position for the roadbed. The largest settlement occurs below the center of shape of the new extended roadbed. It is found that the method of step-jointing is effective for reducing and controlling the differential settlement of jointing of new and old roadbed.
What problem does this paper attempt to address?