Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches

Yi-ping ZHANG,Ya-nan YU,Hong-wei ZHOU
DOI: https://doi.org/10.3969/j.issn.1000-7598.2006.07.031
2006-01-01
Abstract:In order to study the causes of post-construction settlement of deep-jet-mixed (DJM) pile composite foundation at bridge approaches, the settlement is analyzed and back-analyzed by Biot's consolidation FEM. The soil constitutive model is the Duncan-Chang nonlinear elastic model in finite element analysis; and Duncan-Chang nonlinear elastic model and Merchant viscoelastic model are used in finite element back-analysis. The computation results show that the traffic load and soil creep are the main causes induced the post-construction settlement of DJM pile composite foundation. The traffic load is the main cause at early period, but soil creep is the main cause at post period.
What problem does this paper attempt to address?