Performance analysis of cast-in-place tubular pile composite ground under embankment load

Ming-shuang ZHU,Jin-chang WANG,Xiang-rong ZHU
DOI: https://doi.org/10.3785/j.issn.1008-973X.2006.12.035
2006-01-01
Abstract:To improve the stabilization of soft soil foundation and reduce the settlement of road foundation, the service performance of cast-in-place tubular pile composite ground was investigated. Through analyzing the in-situ test data, the curves of pile and soil top average stress ratio of composite foundation changing with embanking time were obtained. The rules of road foundation settlements in the center and pile top varying with embanking time were studied, and the pore pressure laws changing with time were discussed. Research results indicate that the average soil stresses between piles increase first and then decrease with embanking time, but the average pile-top stresses increase continuously. The settlements of composite foundation mainly decrease with the increasing depth, and arise in the range of depth less than 4 meters. The change of lateral displacement in foundation with depth is small, the combined reinforcement effects of tubular pile and geogrid are very obvious, and the shrinking of lateral displacements exists.
What problem does this paper attempt to address?