Influence of time difference schemes on Biot's consolidation FEA of roadbed foundation

Zhou-xiang DING,Yong-li XIE,Xiao-nan GONG,Jian-lin YU
DOI: https://doi.org/10.3321/j.issn:1671-8879.2005.02.008
2005-01-01
Abstract:Based on virtual work principle and linear difference method, the finite element equations are formulated after time-spatial discretization. The distributions of deformation and excess pore pressure (EPP) for roadbed under embankment are studied using finite element method. The results and their relative errors for finite element analysis by Crank-Nicholson, Galerkin and fully-implicit time difference schemes (TDS) are compared respectively in time and spatial domain. The results show that basic reqularities of numerical solutions by three TDSs remain nearly same; the value of roadbed center settlement by Crank-Nicholson and Galerkin TDSs is underestimated at earlier consolidation process and slightly overestimated later, in reverse of lateral displacement and EPP; the EPP and vertical deformation near slope toe are affected mostly apparently by different TDS, especially for Crank-Nicholson TDS. The following conclusions could be drawn that the relative errors of results by different TDSs relate closely to consolation process, but the abstract errors keep so small that every TDS could satisfy the need of engineering analysis.
What problem does this paper attempt to address?