Automatic Switchover Device Adaptive to Distribution Line Non-Communication Protection

LIU Kun,DONG Xinzhou,BO Zhiqian
DOI: https://doi.org/10.3969/j.issn.1006-6047.2013.06.027
2013-01-01
Abstract:According to the characteristics of non-communication protection for distribution line,the startup criterion and operation time of UV(Under Voltage) module are redesigned for a new kind of automatic switchover device to minimize the power recovery time.When the automatic switchover device responds to a permanent fault,two disturbances caused by its close and open operations induce the current variation within the speed-up time window of the AOC(Accelerated Over-Current) module of the protection at opposite side,which accelerates the removal of fault at source side.Real-time digital simulation verifies the effectiveness of the proposed scheme.
What problem does this paper attempt to address?