Nove1 Distribution Line Automation Mode

DONG Xin-zhou,SHI Shen-xing,WANG Bin,KONG Wei,BO Zhi-qian
DOI: https://doi.org/10.3969/j.issn.1003-8930.2007.03.001
2007-01-01
Abstract:In order to quickly and selectively clear and isolate fault segment from distribution line,then restore power supply for health segments,and also to minish the time of lost power supply and reduce area of lost power supply,a novel distribution line automation system has been proposed.The new system consisted with circuit breaker,distribution line non-communication protection(DNCP) and Backup Source Automatic Control Unit.As a fault occurred on a distribution line,the breaker and non-communication Protection in the faulted segment's ends will operate to clear the fault segment.The segments of lost power supply will again get power supply from back-up source by the control unit,so that its power supply will be restored.Any Breaker only need to operate one time for clearing a fault in the new system.For a 6 segments distribution line,the longest clearing time is about 1.1 second and the sound segments will get a new source in 1.2 second.
What problem does this paper attempt to address?