THE MESH WINDING OF TEE-SHAPE TUBE

WANG Xian-feng,FU Hong-ya
DOI: https://doi.org/10.3969/j.issn.1003-0999.2012.01.010
2012-01-01
Abstract:Firstly,the tee-shape model is established according to the need to wind the transition area of tee-shape tube,and the winding trajectory is also designed to deal with the specific situation of the transition area.Then,the transition area of the tee-shape tube is divided into three parts and the winding trajectories of the three parts are designed respectively.All of the winding trajectories should be arranged in certain order to ensure that the winding process would be carried out smoothly.The doffing points should be found out from the surface of the meshed tee-shape model by using the mesh winding theory.Finally,the tee-shape winding experiment is carried out after the winding codes are programmed through post disposal.
What problem does this paper attempt to address?