Technology Process and Plant Layout for Production of Large Diameter PCCP

刘烨华,白家瑞,程翠林
DOI: https://doi.org/10.3969/j.issn.1000-0860.2009.11.015
2009-01-01
Abstract:The successful production and application of the pre-stressed concrete cylinder pipe with the super-large diameter of 4 m during the construction of the Mid-route of the South-to-North Water Transfer Project are briefly introduced herein in the aspects such as the production technology, plant layout, facilities equipped, production capacity, etc. , which can be taken as the references for the similar projects concerned.