Design and Operation of Upgrading and Retrofitting Project of A2/C Oxidation Ditch Process

Kai-ming YANG,Xiao-lin YANG,Hua WANG,Tai-fu LI
DOI: https://doi.org/10.3969/j.issn.1000-4602.2012.18.013
2012-01-01
Abstract:The upgrading and retrofitting project of Chongzhou WWTP required the effluent quality to meet the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002).After comparison of various schemes,hydraulic transformation for the oxidation ditch and sludge reservoir basins was performed,and rotary fibre disk filtration process was added on the basis of retaining the existing A2/C oxidation ditch system.The project had characteristics of low civil engineering investment and short construction cycle.The operation monitoring showed that the SS was significantly reduced,and the BOD5 and TP were decreased.The effluent quality was better than the first level A criteria.