Design and Operation of the Second Wastewater Treatment Plant in Jinan City

Hong-bo WANG,Mei LI,Jun-ting YU,Jun-jie TAO
DOI: https://doi.org/10.3321/j.issn:1000-4602.2006.14.027
2006-01-01
Abstract:The Second Wastewater Treatment Plant in Jinan City uses the oxidation ditch process and its design capacity is 20×10~4 m~3/d.The process scheme,design data and main facilities are presented.Meanwhile, problems in operation such as sand pipeline jam of the grit chamber and high energy demands of the oxidation ditch,and measures taken to solve the problems are discussed.The optimum operating conditions are put forward.The results show that maintenance cost reduces and energy demands decreases.The concentrations of BOD_5,COD,SS,TP,and NH_3-N are 10 mg/L,50 mg/L,18 mg/L,1.0 mg/L and 0.4-0.5 mg/L in the effluent,respectively.