Upgrading Project of Bishui Underground Wastewater Treatment Plant and Ecological Complex Construction

Feng HOU,Kai-jun WANG,Yan-qing SHAO,Xiao-fei XUE,Hong-tao PANG,Yuan-yuan GUO,Peng LI,Xiao-xin CAO
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2017.10.012
2017-01-01
Abstract:As the core project of water environment improvement in Beijing sub-civic center,Bishui underground wastewater treatment plant was built through public-private partnership model,which located in the original plant and covered 1/3 area of original plant.During the upgrading construction period,the performance of the original wastewater treatment plant was kept stable and the effluent quality could meet the emission standard requirements.The treatment capacity of the new underground plant was improved from 10 × 104 m3/d to 18 × 104 m3/d.The combination treatment processes were adopted in the new underground plant,including multi level A/O process,double rectangular-horizontal flow sedimentation tank,high-efficiency settling tank,UF advanced treatment unit,low temperature sludge drying and biological deodorization technology.The requirement of effluent quality standard was upgraded from first grade B standard of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) to B standard of Beijing Discharge Standard of Water Pollutants for Municipal Wastewater Treatment Plant(DB 11/890-2012).Urban ecological complex was constructed by the Bishui underground wastewater treatment plant together with the ground landscape and municipal facilities.In the urban ecological complex,the wastewater treatment,ecological landscape,recreational activity and popular science bases were built into an integral circle.
What problem does this paper attempt to address?