Overall Design of Shengli Bridge in Tongliao City

ZHU Yu-feng,CHEN Guo-dong,LIU Yong-sheng,ZHANG Na-na
DOI: https://doi.org/10.3969/j.issn.1671-7767.2011.04.003
2011-01-01
Abstract:A 3×81.44 m simply-supported concrete-filled steel tube tied arch is designed for the main bridge of Shengli Bridge in Tongliao City,and the rise-to-span ratio of the arch is f/L=1/5.The substructure incorporates a structural form of group piles plus pile caps.The arch ribs are two deck arch ribs of vertical dumbbell shape.To ensure the spatial stability of the tied arch,three wind bracings are arranged between the two arch ribs.17 pairs of suspenders are installed for each span of the arch bridge,a suspender is composed of 85 galvanized high strength steel wires each of 7 mm in diameter,and the suspenders are large torque finished cables with double protective layers produced in factory.The tied beams are set between the bicycle and footway lanes and the cross section of the beams is the box section.Each span of the arch bridge has 17 middle cross beams and two end cross beams,of which the middle cross beams are prestressed concrete(PC) T-beams while the end cross beams are cast-in-situ two cell single box concrete beams.The floor system is formed of PC cross beams,reinforced concrete longitudinal stiffening beams and trough slabs.The static and stability analyses of the overall bridge indicate that the design meets the code requirements.The construction scheme of "erecting beam first and arch late" is adopted for the bridge,and the operation condition of the bridge is so far so good after completion of the construction.
What problem does this paper attempt to address?