De-Excitation Simulation of 1 000 MW Steam-turbine Generator after Abrupt Three-phase Short Circuit

CHEN Xian-ming,WANG Wei,LIU Guo-hua,ZHU Xiao-dong
2008-01-01
Abstract:Fast de-excitation is one of main measures for protecting generators. De-excitation of steam-turbine generator after abrupt three-phase short circuit(ATPSC)is serious situation. It is important that how much capacity of varistor should be equipped properly. The aim of the paper is trying to estimate capacity of varistor of a 1 000 MW generator through simulation of it after ATPSC. In simulation, besides field winding, damping action of forge rotor in d,q axis, and second q axis damping winding were considered. In addition, non-linearity of d axis no-load characteristic(NLC)of generator was accounted. But the saturation in q axis of NLC was ignored, that is why magnetic energy obtained in q axis is a bit large. Structure schemes with integral operator 1/S for solving differential equation of Simulink were used. The example of simulation is about 0.1 second delay de-excitation ATPSC of a 1 000 MW generator with rated load. The results show that the simulation is successful.
What problem does this paper attempt to address?