Testing Method with Loads of Direct Current Commutation Transformer

ZHANG Jian,XIAO Yu-hua,YUAN Yu-bo,HUANG Hao-sheng,ZHANG Jia-min,LI Peng
DOI: https://doi.org/10.3969/j.issn.1009-0665.2013.01.015
2013-01-01
Abstract:In the testing of commutation station,the polarity and transformation ratio of CT need to be obtained by measuring the current magnitude and phase of the second side of CT.In this paper,calculation method of reactive power when transmitting different active power is inferred,of which the rightness is verified by testing data in the case of Zhengping commutation station.Calculation method of the second side of CT of converter transformer is proposed.Rightness of CT polarity and transformation ratio is confirmed by comparison with current value and calculated value of the second side of CT of testing data when transmitting 10% of nominal active power.