Investigation on Semiconductor Test Scheduling

Zhang Zhicong,Zheng Li,Zhang Tao
DOI: https://doi.org/10.3969/j.issn.1003-353X.2008.01.012
2008-01-01
Abstract:Semiconductor test is a capital intensive multi-product production process with complicated testing resources.To test a semiconductor product,a tester,a handler and an enabler are simultaneously in need.The relationship of product and qualified tester-handler-enabler combination is very complicated.Most semiconductor test problems are multiple resources constrained unrelated parallel machine scheduling problems with consideration of sequence-dependant setup times.A survey on semiconductor test scheduling respectively from the point of view of problem category and methodology were given.The semiconductor test scheduling problems were analyzed by two categories:without and with simultaneous resources constraint.The scheduling methods in literature were summarized and their characteristics were discussed by comparison.
What problem does this paper attempt to address?