Capacity Planning in Semiconductor Assembly and Test Manufacturing System

LI Na,ZHENG Li,NIU Sophia
DOI: https://doi.org/10.3969/j.issn.1001-4098.2006.08.022
IF: 2.034
2006-01-01
Systems Engineering
Abstract:Semiconductor assembly and test manufacturing is highly complex with intricate processes and resources.The capacity planning is involved in many problems including demand distribution to multi-factories,resource optimization and allocation for single factory,and resource purchase planning when capacity shortage occurs.For solving these problems,this paper firstly describes the details of main points in semiconductor assemble and test line capacity planning process,then proposes the process insensitive linear programming model which takes the concept of ″production process model″(PPM) and solves the capacity allocation problems.Based on the result of the former model,another derived model is constructed for setting resource purchase planning.The models have been successfully applied on Intel's Assemble and Test production line.As a result,the time of capacity planning has decreased from 22 hours with the original method using spreadsheets to 2 hours at present.At the same time,2.4 million dollars have been saved for Intel factories by using this optimized resource allocation method.
What problem does this paper attempt to address?