THE RUNNING ANALYSIS OF WULONGKOU SEWAGE TREATMENT PLANT IN ZHENGZHOU

Yan Huaiguo,Ji Min,Liu Xuzong,Xing Lei
2008-01-01
Environmental engineering
Abstract:Wulongkou sewage trentment plant is designed with a capacity of 100000m~3/d.A modified oxidation ditch process is used for two-stage biochemical treatment of sewage.The sewage treatment process and design of structures are determined accsrding to the features of wcder quality.The operation results show that the plant runs stably with a high removal rate of pollutants,whose emission can be up to the standards.
What problem does this paper attempt to address?