Simulation Analysis and Erection Process of the Steel Roof for Qujing Stadium

He Rong,Zhou Feng,Zhu Wenwei,Wang Jianfei,Tong Lewei,Chen Yiyi
DOI: https://doi.org/10.7672/sgjs2013170121
2013-01-01
Abstract:The steel roof of Qujing Stadium is a large-span suspended pipe truss structure.The structure was assembled into segments,hoisted outside the plan,and closed in the air.The impact of process can't be neglected,so the erection process was simulated and analyzed by SAP2000.Simulation on every installation step of plan truss agrees with actual situation.The result shows that the stress ratio of most members is between 0 and 0.1.The"X"structure unit is relatively independent to each other.The low temperature in winter has little influence on the construction.
What problem does this paper attempt to address?