Construction monitoring of the steel structure for Hangzhou East Railway Station Building

LUO Yao-zhi,LIU Dun,SHEN Yan-bin,JIN Li,DONG Shi-lin
2013-01-01
Abstract:With the aid of self-developed measurement system of structural stress based on wireless sensor network,stress monitoring in construction stage was applied to the steel structure for Hangzhou East Railway Station Building.The composition of monitoring system,layout of measuring point and main monitoring results were presented in detail.Through tracking and monitoring structural stress during elevated construction of block unit trusses and forming process of whole roof trusses,the variation law of key components' stress was given,such as spinal pipe steel columns,giant lattice steel columns and roof trusses.At the same time,the measured stress data was compared with the calculated values by finite element theory.It indicated that the measured data and theoretical values were in good agreement under the elevated construction of block unit,but existed a deviation in the forming process of whole roof.
What problem does this paper attempt to address?